Webinar · Greenovation case study

How does a multi-storey car park become a A flagship?

The Neu-Ulm case study — live. 20 minutes in which we unveil a completed moss façade: what was required, what was built and how much it cost.

Wednesday, 27 January 2027 · 10.00–10.20 am
online · Speaker: Jens Loschke, Sales Manager

Add the appointment to your calendar
Visualisation of the Bechtle AG multi-storey car park in Neu-Ulm with a moss façade
That was the plan — the visualisation from the design phase.
The multi-storey car park, which is currently covered in scaffolding, whilst the moss façade is being installed
Assembly on the scaffolding: every metre installed by hand, across six levels.
The completed multi-storey car park with a full-surface moss façade
Completed, September 2026 — 1,635 m² with no irrigation and no maintenance.

The task

A multi-storey car park in Neu-Ulm, visible from the street, unassuming in design — and meeting all the requirements placed on a façade in a public space.

The solution

How the moss façade was planned, inspected and installed: structure, substructure, structural analysis and the process on site.

Your questions

Fire safety, tendering and costs — the final part is devoted to questions from the participants.

Register for the webinar

Free of charge. We’ll email you the access link shortly before the event. Can’t make it? Register anyway — the recording will be available on this page from 28 January.

Do you have a specific project? *

We treat your data as confidential. It will not be passed on to third parties — for further details, see the Privacy Policy.